Sunday, May 8, 2011

Installing Control Components

More progress today. The first pictures show the port mechanism going together. The first is without the top plate installed and shows the hydraulic cylinder that controls the shaft rotation. You can also see the plunger cylinder below. It extends into the notch and locks the fins in their centered position. When active, the pin retracts and frees the fins to rotate.

Click image for larger version

Name:	_DSD4121.JPG
Views:	98
Size:	130.1 KB
ID:	27124
Click image for larger version

Name:	_DSD4124.JPG
Views:	88
Size:	134.0 KB
ID:	27125

Next I installed the starboard control valve and the hydraulic tank and filter. The tank has an assortment of ports that either have to be plugged or have valves and accessories installed. The next picture shows the tanks on my make-shift work bench with the valves and fittings lying around, then installed.
Click image for larger version

Name:	_DSD4125.JPG
Views:	83
Size:	90.1 KB
ID:	27126
Click image for larger version

Name:	_DSD4131.JPG
Views:	82
Size:	114.2 KB
ID:	27127

The next two are the pressure regulator installed centrally between the two actuators. This maintains a constant operating pressure independent of engine/pump speed.

Click image for larger version

Name:	_DSD4134.JPG
Views:	81
Size:	94.9 KB
ID:	27128

Click image for larger version

Name:	_DSD4135.JPG
Views:	75
Size:	62.7 KB
ID:	27129

One thing that became evident after installing the tank is how tight things are on the starboard side. It's tighter than I'd like, but I can get at everything so I think it will be OK. I figure it's no worse than working on most cars. Worst case, I'll remove the tank if major work is needed.

Click image for larger version

Name:	_DSD4133.JPG
Views:	80
Size:	118.3 KB
ID:	27130

The next picture shows the oil cooler and in it's tentative location, then a wider shot of the bulkhead including the 12V to 24V power converter (the copper colored box up high). I still need to finalize the cooler location, figure out how to mount it, and re-plumb the raw water intake for the starboard engine.

Click image for larger version

Name:	_DSD4132.JPG
Views:	81
Size:	128.8 KB
ID:	27131
Click image for larger version

Name:	_DSD4137.JPG
Views:	85
Size:	96.0 KB
ID:	27132

And last but not least, the pump with suction hose installed. That's the first of 16 hydraulic hoses that need to be made up. 15 left to go.
 
Click image for larger version

Name:	_DSD4126.JPG
Views:	73
Size:	73.5 KB
ID:	27133

 

No comments:

Post a Comment

Make comments here