Thursday, May 29, 2014

Construction update, week 68 - She's Done!

She's done!  Or at least close enough to declare it done and make the big payment.  She's booked on a freighter which is on it's way to pick here up.  Once back in the US we start the commissioning which will take 3 months, give or take.

Bottom paint is on, zincs are installed, and Propspeed is on the running gear.

Wing running gear

Main prop, cutter, and PropSpeed

Main prop

Here's a good profile.  You can see the cables running from the cradle up through the bow thruster tunnel, and up through the hausepipes.  I'm assuming it's all part of securing the boat for it's ride across the Pacific.

Profile shot

One thing we added along the way was this stainless bash plate and tow eye.  The tow eye is a great attachment point for an anchor snubber, and the plate helps protect against strikes of logs and the like.  It's hard to see in the picture, but it extends about 8" below the water line.

Bash pate and tow eye


Stern with swim ladder

Exhaust port for diesel exhaust.  Also swim shower box.

Close-up of diesel heat exhaust

Propane locker stocked and ready to go

Emergency tiller, articulated so it can clear the cockpit settee and table.

Battery charger and fire extinguisher canister

Lazarette, DC power panel, battery compartments

Steering gear

Auto pilot pumps

Heating system

Air Con unit, pre-wire cable for dive compressor

Glendinning shore power system

Steps into Laz, inverters in the background

Finishing touches on wing engine exhaust

Wing exhaust and day tank

Wing exhaust

Main hydraulic pump with protective cover

Salon with table and seat cushions

Navy blue cushion for cockpit settee

Pilot House cushions in place

Pilot House helm with wheel and Stidd seat base